by Michael S. Hamada, Alyson G. Wilson, C. Shane Reese, Harry F. Martz

Chapter 4 Errata

Table 4.5

p. 114, line for Tester 3 Change “5 4.7” to “54.7”

Example 4.6

p. 110, line 7 below Table 4.4 Change “that the reliability is between 0.799 and 0.834 with 0.930 probability” to “that the reliability is between 0.799 and 0.834 with 0.90 probability”